is everyone ready?
 
 
If those poles look heavy, just try moving them! It was all hands on deck for the raising of the frame weekend. An amazing effort from everyone involved, we were very lucky to have so many willing helpers. We began with a flat piece of ground and by the end of the weekend, we had a very recognisable three dimensional structure.

The big challenge was to work out how we were going to lift the rather large trusses on to the posts that are about 2.5 metres high. In the end we opted for the partial dismantling of the trusses to make it easier to lift. They were made about 150 years ago by hand and are all joined using traditional mortise and tenon joints. Even though it made it easier to lift the main part of the truss, putting it all back together the next day was still interesting.

The ridge beam went up during Sunday afternoon. With fewer people, we had to think laterally. More ropes and ladders, they were up in a flash.

It was amazing to see it take shape over such a sort time. The next step is to install the rafters and collar ties, followed by the purlins. Now that the posts are up, we will arrange for the laying of termite and damp protection.

It was great to get the main part of the frame together, the next few steps I can we can do on our own - until to bricks arrive!

Thankyou so much to everyone who came along and lent a hand, it makes a big difference to have such good thinkers and doers at times like these. In order of appearance; Rex, Robbie, Tim, Jesse, Ako, Geoffles, Marieke, Penny, Spencer and Barbie.

To keep informed of the next workparty, subscribe to the works calendar RSS feed. Also, don't forget to check out the photos on the works gallery.